黄敦伟,胡爱萍,张宏伟,孔德军.热浸渗铝 X70 管线钢扩渗工艺研究[J].表面技术,2013,42(4):72-75,109.
HUANG Dun-wei,HU Ai-ping,ZHANG Hong-wei,KONG De-jun.Research on Hot Diffusion Aluminizing Process of X70 Pipe Line Steel[J].Surface Technology,2013,42(4):72-75,109
热浸渗铝 X70 管线钢扩渗工艺研究
Research on Hot Diffusion Aluminizing Process of X70 Pipe Line Steel
投稿时间:2013-03-14  修订日期:2013-04-10
DOI:
中文关键词:  X70 管线钢  热扩渗铝  二次正交回归  工艺参数
英文关键词:X70 pipeline steel  hot dip aluminum  quadratic orthogonal regression  process parameters
基金项目:
作者单位
黄敦伟 常州大学 机械工程学院, 常州 213016 
胡爱萍 常州大学 机械工程学院, 常州 213016 
张宏伟 常州阳光渗铝钢有限公司, 常州 213104 
孔德军 常州大学 机械工程学院, 常州 213016 
AuthorInstitution
HUANG Dun-wei College of Mechanical Engineering, Changzhou University, Changzhou 213016 , China 
HU Ai-ping College of Mechanical Engineering, Changzhou University, Changzhou 213016 , China 
ZHANG Hong-wei Changzhou Sunny Aluminized Steel Co. , Ltd. , Changzhou 213104 , China 
KONG De-jun College of Mechanical Engineering, Changzhou University, Changzhou 213016 , China 
摘要点击次数:
全文下载次数:
中文摘要:
      采用二次正交回归试验方法,研究了 X70 管线钢热扩渗铝保温温度、扩渗时间与渗铝层厚度的关系,建立了渗层回归方程,得到 X70 管线钢最优的热扩渗铝工艺参数。 观察了 X70 管线钢热浸渗铝处理后的表面、界面微观形貌,分析了 Fe 和 Al 的含量沿渗层的变化情况,并对热浸渗铝过程中的元素扩散机理进行了探讨。 结果表明:渗铝层厚度随保温温度的升高和扩渗时间的延长而增大,适宜的保温温度为 950 ℃ ,扩渗时间为 6 h。
英文摘要:
      The relationship between hot diffusion aluminizing temperature, infiltration time and thickness of aluminized coating of X70 pipe line steel was researched by quadratic orthogonal regression testing method. The regression equation of the alloying layer thickness was established. The optimum process for hot diffusion aluminizing treatment was gotten. The surface and interface morphologies of X70 pipeline steel after the aluminizing treatment were observed, and Fe and Al content change by the carbonitride layer were analyzed. The element diffusion mechanism of hot dipping alumetizing process was discussed. The results show that alloying layer thickness is increased with the rising of insulation temperture and the extending of diffusion time. The ideal inoulation temperature is 950 ℃ and time is insulation 6 h.
查看全文  查看/发表评论  下载PDF阅读器
关闭

关于我们 | 联系我们 | 投诉建议 | 隐私保护 | 用户协议

您是第20063348位访问者    渝ICP备15012534号-3

版权所有:《表面技术》编辑部 2014 surface-techj.com, All Rights Reserved

邮编:400039 电话:023-68792193传真:023-68792396 Email: bmjs@surface-techj.com

渝公网安备 50010702501715号